国内精品久久人妻无码妲己,欧美综合婷婷欧美综合五月,欧美老人巨大xxxx做受,欧美性生交XXXXX久久久,亚洲AV综合A国产AV中文,久久久久亚洲AV成人网人人网站,国产+日韩+另类+视频一区,久久久久波多野结衣高潮,亚洲爱婷婷色婷婷五月,国产在线观看WWW污污污

News

Hvac knowledge: room air conditioning intercooler slight leakage of ammonia processing steps?
Release date:2013-03-25 Views:4770
1. The low pressure stage compressor emergency stop;
2. Quick closing solenoid valve or in front of the float valve for liquid valve, the coil into the liquid valve;
3. Open the drain valve, intercooler drainage barrels into the hydraulic valve, the drainage drainage barrel;
4. Open the high-pressure compressor fit;
5. The drainage 20 min after close the drain valve;
6. Time after high pressure stage compressor stop;
To repair, for welding shall be submitted to the approval, the safe production administration on the premise of ensure safety;
Can be back to normal after 8. Pressure testing, qualified production;
9. Object completely immediately after returning to normal production operation;
10. Make records.